Process infrastructure

Fabrication, supports, and instrumentation are completed under one roof. Factory-built modules reduce field welding and schedule risk.
Pipe racks are where field hours hide. Shop-built modules take the weld, the support steel, and the instrument mounts off the pad and put them on a known ship date.
Less field weld, less weather, a known ship date.
Design for manufacture and assembly
Factory fabricated and documented
Engineered for transport and field connection
Inspection records travel with the module
Factory sequence
01
Corridor broken into transportable modules
02
Steel, pipe, and supports fit in the shop
03
Dimensional check against the tie-in points
04
Set, align, and connect on site