A factory, not a job trailer.

High-bay assembly hall

Modules are built under a roof, on a controlled sequence, with the crane, the test bays, and the inspection record in the same building.

High-bay assembly sized for finished modules, not loose components

High-ton lift so a completed unit can be moved as one piece

Precise fabrication for steel, bus, pipe, and controls

Dedicated electrical and thermal witness-test zones

Documentation and as-builts produced with the work, not after it

Schedule a Tour

Production system

Built for throughput, not for looking busy.

Most shops load every station so the floor looks full. That stacks half-finished modules and stretches the time from release to the dock. IronSpan runs the floor for throughput. Work moves in a set sequence, cycle time comes down with every repeat, and a finished, tested module is the only thing that counts as progress.

Set the pace

The test bay, the crane, and the ship date set the rhythm of the building. Fabrication and assembly are planned to that rhythm, not the other way around.

Keep work moving

A module is released when the next station can take it. Partial units sitting in front of test are delay, not progress.

Same sequence, shorter cycle

Cycle time is release to dock, not hours logged. The same steps, the same hold points, and the same lift plan make the second module faster than the first.

Protect the ship date

A late witness test is the failure, even if fabrication finished early. The floor is judged on finished, tested modules, not on how busy it looked.

The floor

Four zones. One building.

Fabrication

Steel, bus, pipe, and supports cut and fit before they ever meet the module. The work is measured here, not argued on the pad.

High-bay assembly

Finished modules, not loose kits. High-ton lift so a completed unit moves as one piece from the bay to the dock.

Electrical test

Point-to-point and witness test on E-Houses and electrical skids before the lineup is closed up.

Thermal test

Functional and witness test on cooling and mechanical modules. Setpoints are proven, then written down.

What a tour covers

A tour is the bay, the test zones, and the paperwork that travels with a module. We walk the sequence a unit actually follows, from fit-up to the dock.

How a module is staged so the second one is faster

Where inspection hold points sit

What the customer sees at witness test

How lift and transport are designed with the product

What the factory replaces

Multi-vendor field integration, weather delays, and commissioning that discovers the drawing.

What leaves the dock

A tested module, an inspection package, and a site sequence that has already been proven.