Platforms Facility Approach About Careers Schedule a Tour
Prefabricated electrical module at a data center campus

Prefabricated modular infrastructure

Mission-critical infrastructure, industrialized.

IronSpan builds factory-integrated modular infrastructure — E-Houses, electrical skids, mechanical modules, pipe racks, containment, and hydronic systems — for data centers and mission-critical facilities. Design, fabrication, test, and delivery run as one Engineering-to-Manufacturing workflow.

High-bayFactory capacity
100-tonHigh-bay lift
E2MOne industrial workflow
ISO & State ModularAligned QA / QC

Prefabricated power

E-Houses

Factory-integrated electrical buildings with switchgear, UPS, VFDs, transformers, and auxiliaries — tested before they ever see the site.

Prefabricated power

Electrical Skids

Factory-built electrical skids that collapse multi-vendor field integration into one tested package.

Mechanical systems

Mechanical Modules

Complete mechanical process and cooling modules engineered, assembled, and factory-tested as integrated systems.

Process infrastructure

Pipe Racks

Prefabricated pipe-rack modules engineered for transport, lift, and rapid field connection.

High-density thermal

Hot Aisle Containment

Repeatable hot-aisle platforms for AI clusters, built for liquid-cooling readiness and clean aisle discipline at scale.

Liquid cooling plant

Hydronic Cooling Skids

CDU and secondary-loop skids engineered as precision products — pumps, exchangers, controls, and valves on a frame that has already been tested.

Where demand is

Hydronic Cooling Skids

Cooling skids leave the factory as a product with a witness test, not a pile of components waiting on a pad. Secondary loops and CDU packages are built to a controlled sequence.

The thermal plant is proven before the crane arrives.

Pumps, exchangers, valves, and controls on one frame

Factory assembly and functional test

Documented setpoints and as-built package

Lift and interconnect engineered with the skid

Full cooling page

Architecture
CDU or secondary-loop skid
Typical contents
Pumps, exchangers, controls, valves
Integration
Factory piped and terminated
Testing
Functional and witness test before shipment
Deployment
Set, land, and interconnect
Best for
Liquid-cooled halls and plant expansions

Why modular

Why Modular

Stick-built

  • Design split across consultants and vendors
  • Integration risk lives on the pad
  • Commissioning discovers the drawing
  • Schedule floats with trades and weather

IronSpan Modular

  • Engineering owns DFMA through shipment
  • Integration happens under a roof
  • Witness test before the crane arrives
  • Repeatable platforms, predictable velocity

Where it deploys

Built for the projects that cannot slip.

Hyperscale AI

Power modules, containment, and liquid loops sized for clusters that cannot wait on a conventional fit-out.

Colocation expansion

Add capacity beside a live hall without turning the white space into a construction site.

Utilities & industry

E-Houses and process modules for substations and sites that cannot carry a field crew.

Density retrofits

Drop containment, cooling skids, and mechanical modules into buildings that were never drawn for liquid.

High-bay assembly hall

Factory capability

A factory, not a job trailer.

High-bay assembly, high-ton lift, precise fabrication, and dedicated electrical and thermal witness-test zones. Capacity is sized so the second module is faster than the first.

See the facility

Engineering to manufacturing

One workflow. Four accountable stages.

  1. 01

    Project Controls

    Critical path and milestone tracking stay in one system. Schedule, velocity, and communication do not live in separate inboxes.

  2. 02

    Engineering

    DFMA, modeling, and system integration, including the state modular submittal and the UL procedure the assembly is built to. The same team that draws it is accountable for how it is built.

  3. 03

    Manufacture & Test

    High-bay assembly, precise fabrication, and dedicated electrical and thermal witness-test zones.

  4. 04

    Ship & Commission

    Modules leave with documentation, inspection records, and a site sequence that is already proven.

Ready to industrialize the next hall?

Bring the project, the site, and the date. We will tell you which platform fits and how the factory sequence runs.

Schedule a Tour