State modular programs
When the destination state regulates the module as an industrialized building, we file to that state’s program before steel is cut.
The applicable program and adopted code identified with the model
Third-party plan review scheduled with fabrication, not after it
In-plant inspection as a hold point the floor can see
State insignia applied before shipment when the state requires it
Approved drawings and inspection records travel with the module
